(Click on pics for full size view)
Weeks 21-22
Week 21 – lots of scaffold
Week21 – windows fitted, chippies inside
Week 22 – frames for Nos 13 and 14
Week 22 – Carpenters first fix; Flat 18
Week 23
Week 23.1 – who left that there?
Week 23.2 – plumbers’ first fix in the kitchen
Week 23.3 – Brickies on the flats
Week 23.4 – Roof for Number 24, please.
Week23.5 Certainly, Sir, Coming right up!
Week 23.6 – No. 14 done – in 10 mins.
Week 27
Week-27; Six buildings in process. Half way for timber frames
Week-27.1; Mixed finishes – brick or render, each with red or slate roof.
Week-27.2; Bases for plots 19 to 23
Week-27.3; Flat 16 first fix
Week-27.4; Flat 17 fawn units
Week-27.5; Flat 15. Whit-units awaiting tiles
Week-27.6; Flat-18. Doing 2nd-fix electrics
Week-27.7: Flat 18. Tiled bathroom.
Week-27.8-Flat 16; Note the floating-floor